Cagayan de Oro City, Misamis Oriental

Solar Company in Cagayan de Oro —
Stop Overpaying CEPALCO

SolarStream installs complete hybrid solar systems for CDO homes and businesses. CEPALCO electricity at ₱11–₱13/kWh pays back a solar system in 4–6 years. Free site assessment — we come to you.

Book Free Assessment Calculate My Savings

CEPALCO Bills Cut 90–97%

CDO's CEPALCO rate of ₱11–₱13/kWh is among the highest in Mindanao. A correctly sized solar system wipes out the variable portion of your bill — leaving only ~₱400/month in fixed charges.

Hybrid Battery Brownout Protection

All SolarStream hybrid systems include LiFePO4 battery storage — switching to battery during brownouts in under 20ms with zero noise and no diesel cost.

CEPALCO Net Metering Managed

SolarStream handles the complete CEPALCO net metering application — documents, submission, inspection coordination, and bidirectional meter scheduling. No utility office visits required.

All-In System Packages Delivered to CDO

3KW Hybrid
₱150K–₱200K
For ₱2,000–₱5,000/month CEPALCO bills. Covers daytime loads + basic overnight battery protection.
6KW Hybrid — Most Popular
₱330K–₱450K
For ₱5,000–₱12,000/month CEPALCO bills. Full household including 1–2 aircon units + overnight protection.
10KW Hybrid
₱520K–₱700K
For ₱10,000–₱20,000/month bills. Commercial and large residential. Free energy audit included.

CDO Areas Served

Divisoria
Lapasan
Bulua
Carmen
Nazareth
Cogon
Patag
Puerto
Macabalan
Bayabas
Balulang
Bugo
Kauswagan
El Salvador
Tagoloan
Opol

Free Solar Assessment — Cagayan de Oro

SolarStream sends a technician to your property, reviews your CEPALCO bills, and gives you an exact quote — no obligation, no pressure.

Book Free Assessment